{"id":438,"date":"2024-07-07T12:45:52","date_gmt":"2024-07-07T12:45:52","guid":{"rendered":"https:\/\/contrastesdaplanicie.pt\/?post_type=project&#038;p=438"},"modified":"2025-12-06T15:01:21","modified_gmt":"2025-12-06T15:01:21","slug":"construction-of-an-agricultural-warehouse","status":"publish","type":"project","link":"https:\/\/contrastesdaplanicie.pt\/en\/project\/construcao-de-armazem-agricola\/","title":{"rendered":"Construction of agricultural warehouse"},"content":{"rendered":"<p class=\"wp-block-paragraph\">A <strong>Contrastes da Plan\u00edcie<\/strong> In 2024, it carried out the complete construction of a warehouse structure, from the foundations right through to the final cladding. The project began with the topographical survey and the execution of the <strong>direct foundations<\/strong>, including footings, connecting beams and levelling screeds, ensuring a solid and perfectly level foundation. This stage ensured the structural stability required to withstand the vertical loads and lateral forces typical of this type of building.<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"960\" height=\"540\" data-id=\"442\" src=\"https:\/\/contrastesdaplanicie.pt\/wp-content\/uploads\/2025\/12\/469285054_936331328501347_3846698703556676709_n1.webp\" alt=\"\" class=\"wp-image-442\" srcset=\"https:\/\/contrastesdaplanicie.pt\/wp-content\/uploads\/2025\/12\/469285054_936331328501347_3846698703556676709_n1.webp 960w, https:\/\/contrastesdaplanicie.pt\/wp-content\/uploads\/2025\/12\/469285054_936331328501347_3846698703556676709_n1-480x270.webp 480w\" sizes=\"(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) 960px, 100vw\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"960\" height=\"720\" data-id=\"441\" src=\"https:\/\/contrastesdaplanicie.pt\/wp-content\/uploads\/2025\/12\/468861495_936331425168004_688509207596119662_n2.webp\" alt=\"\" class=\"wp-image-441\" srcset=\"https:\/\/contrastesdaplanicie.pt\/wp-content\/uploads\/2025\/12\/468861495_936331425168004_688509207596119662_n2.webp 960w, https:\/\/contrastesdaplanicie.pt\/wp-content\/uploads\/2025\/12\/468861495_936331425168004_688509207596119662_n2-480x360.webp 480w\" sizes=\"(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) 960px, 100vw\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"960\" height=\"720\" data-id=\"443\" src=\"https:\/\/contrastesdaplanicie.pt\/wp-content\/uploads\/2025\/12\/468834708_936331455168001_350293466689072677_n3.webp\" alt=\"\" class=\"wp-image-443\" srcset=\"https:\/\/contrastesdaplanicie.pt\/wp-content\/uploads\/2025\/12\/468834708_936331455168001_350293466689072677_n3.webp 960w, https:\/\/contrastesdaplanicie.pt\/wp-content\/uploads\/2025\/12\/468834708_936331455168001_350293466689072677_n3-480x360.webp 480w\" sizes=\"(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) 960px, 100vw\" \/><\/figure>\n<\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Once the structural base had been completed, work began on assembling the <strong>load-bearing metal structure<\/strong>, comprising portal frames made of rolled sections, columns and sturdy beams, dimensioned in accordance with the requirements for mechanical strength and durability. This was followed by the installation of the <strong>self-supporting metal cladding<\/strong> on the roof and walls, using profiled sheet metal panels or sandwich panels, in accordance with the project specifications. These materials ensure excellent thermal performance, high resistance to corrosion and a uniform finish, suitable for the most hostile environments.<\/p>","protected":false},"excerpt":{"rendered":"<p>A Contrastes da Plan\u00edcie desenvolveu em 2024 a constru\u00e7\u00e3o integral de uma estrutura de armaz\u00e9m, executada desde a fase de funda\u00e7\u00f5es at\u00e9 ao revestimento final. O projeto iniciou-se com a implanta\u00e7\u00e3o topogr\u00e1fica e a execu\u00e7\u00e3o das funda\u00e7\u00f5es diretas, incluindo sapatas, vigas de liga\u00e7\u00e3o e betonilhas de regulariza\u00e7\u00e3o, garantindo uma base s\u00f3lida e perfeitamente nivelada. Esta [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":462,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"project_category":[19],"project_tag":[],"class_list":["post-438","project","type-project","status-publish","has-post-thumbnail","hentry","project_category-construcao"],"_links":{"self":[{"href":"https:\/\/contrastesdaplanicie.pt\/en\/wp-json\/wp\/v2\/project\/438","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/contrastesdaplanicie.pt\/en\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/contrastesdaplanicie.pt\/en\/wp-json\/wp\/v2\/types\/project"}],"author":[{"embeddable":true,"href":"https:\/\/contrastesdaplanicie.pt\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/contrastesdaplanicie.pt\/en\/wp-json\/wp\/v2\/comments?post=438"}],"version-history":[{"count":5,"href":"https:\/\/contrastesdaplanicie.pt\/en\/wp-json\/wp\/v2\/project\/438\/revisions"}],"predecessor-version":[{"id":482,"href":"https:\/\/contrastesdaplanicie.pt\/en\/wp-json\/wp\/v2\/project\/438\/revisions\/482"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/contrastesdaplanicie.pt\/en\/wp-json\/wp\/v2\/media\/462"}],"wp:attachment":[{"href":"https:\/\/contrastesdaplanicie.pt\/en\/wp-json\/wp\/v2\/media?parent=438"}],"wp:term":[{"taxonomy":"project_category","embeddable":true,"href":"https:\/\/contrastesdaplanicie.pt\/en\/wp-json\/wp\/v2\/project_category?post=438"},{"taxonomy":"project_tag","embeddable":true,"href":"https:\/\/contrastesdaplanicie.pt\/en\/wp-json\/wp\/v2\/project_tag?post=438"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}