A Contrastes da Planície in 2024, it carried out the complete construction of a warehouse structure, from the foundations to the final cladding. The project began with the topographical implantation and execution of the direct foundations, In addition, the building's foundation, including footings, connecting beams and levelling screeds, ensured a solid and perfectly level base. This stage ensured the structural stability needed to withstand the vertical loads and lateral stresses typical of this type of building.



Once the structural base had been completed, the assembly of the load-bearing metal structure, The structure is made up of laminated profile frames, columns and sturdy beams, dimensioned according to mechanical strength and durability requirements. This was followed by the installation of the self-supporting metal cladding on the roof and walls, using profiled sheet metal or sandwich panels, according to the project specifications. These materials guarantee excellent thermal performance, high corrosion resistance and a uniform finish, suitable for the harshest environments.